South Greensboro Street Sidewalk Project

Two remote public meetings were held on January 28th and January 30th .  The meetings included an update and presentation on the conceptual plan for the project. 

Slides from the public meeting and the concept plan can be viewed at the link below. 


Public Meeting Presentation Slides

Concept Plan ~30% Design

Please note, the concept plan is quite large and may take some time to load. Alternatively, you can right click on the link and 'save file as...' to download to your computer.

If you have any questions or need additional information, please contact: 

Tina Moon, 919-918-7325, cmoon@townofcarrboro.org 

Zachary Hallock, 919-918-7329, zhallock@townofcarrboro.org 

Project Overview

In April 2020, the Town of Carrboro entered into a contract with Ramey Kemp Associates (RKA) to perform engineering services for survey and design work for the South Greensboro Street Sidewalk project. This project proposes constructing a sidewalk along one side of South Greensboro Street from Carr Street to Public Works Drive. This project will include pedestrian safety improvements at intersections along with stormwater improvements where needed. Additionally, a separate analysis of the existing roadway capacity will be conducted to determine the feasibility of reducing the number of vehicle lanes on South Greensboro Street and adding bicycle lanes between the roundabout and the bridge over Morgan Creek (where the bicycle lanes currently end). 

An aerial overview showing the limits of these aspects of the projects is below.

South Greensboro Street Sidewalk Project Limits

South Greensboro Street Sidewalk Map